Office hours Monday to Friday, 7 AM to 5 PM. Licensed plumbers on call 24/7 for plumbing emergencies. Call 979-473-9775

4L Contracting LLC

REMODEL PLUMBING FOR KITCHENS AND BATHROOMS IN COLLEGE STATION AND BRYAN

  • Five star ratedOn Google, by our customers
  • LicensedTexas Master Plumber 40980
  • On call 24/7Licensed plumbers for emergencies
  • Brazos ValleyCollege Station, Bryan and nearby

A remodel is the one time the plumbing in a room can be put where it should have been. It is also the one time a decision made casually becomes expensive to undo. Plumbing on a remodel is two visits with the rest of the project in between.

Rough in happens while the walls are open. Finish out happens once the surfaces are done. Everything in between depends on choices made before the first of those.

4L Contracting handles rough in and finish out plumbing for kitchen and bathroom remodels in College Station, Bryan and the nearby Brazos Valley communities. We work for homeowners and for general contractors. Written pricing comes before authorized work begins. If the project is a new build or an addition rather than a remodel, see new home plumbing.

Request an AppointmentCall 979-473-9775

A finished bathroom with a freestanding bath and tiled shower

Rough In, and What Has to Be Decided Before the Walls Close

Rough in is the supply, drain and vent piping put in place while the framing is accessible, before any surface is covered. Once the drywall goes up, the pipes behind it are fixed in position. Every fixture location, every drain height and every supply stub out becomes permanent.

Rough in fixes the location of everything, so the decisions have to exist before the pipes go in. A few questions catch people out most often. Where each fixture actually sits, and which way a vanity drains. Whether a shower is one outlet or two, and whether a tub is going in as well. And whether the water heater is staying where it is, being replaced, or moving while access is open. If the water heater is moving or being replaced, that decision belongs at the planning stage, not after rough in is done. See water heater installation for what that work involves.

Changing a decision after rough in usually means opening finished work. That is the most expensive way to change your mind on a remodel. It is the reason we ask for a confirmed layout before a single pipe goes in.

Moving a Sink, a Toilet or a Shower to Somewhere It Has Never Been

Relocating a fixture is a different job from replacing one in the same spot. Moving a supply line to a new location can usually be done without much drama. A supply line is under pressure, so we can route it almost anywhere.

The drain is the part that decides whether the plan is realistic. Waste runs on gravity. It has to fall consistently from the fixture all the way to the existing line, without reversing or going too flat. Four things decide what is physically possible: the direction of the joists, and the depth available under the floor. Whether the house is on a slab or has a crawl space, and where the existing stack sits. All of that comes before a single fixture choice is made.

We would rather tell an owner at the drawing stage that a toilet cannot go on that wall. The alternative is finding out on demolition day, when the tile has already been ordered.

What our customers say

Published exactly as written, straight from Google.

  • Found late Friday evening that I did not have hot water, and it was the weekend... YIKES!! Contacted 4L Contracting LLC; they came out within a couple of hours and had me working in a short time. Lee went above and beyond, letting me know about other problems identified in my attic, a problem with my chimney, and a heating vent installation problem. After he left, I found a water leak in the laundry room ceiling. He turned around and came back to my house. He found the air conditioning drain pipe was backed up. He blew it out the drain pipe, preventing a big disaster. So appreciate his thoroughness and helping me on a Friday after-hours house call. He definitely went above and beyond.

    Laurie CunninghamGoogle Review
  • I had a great experience working with 4L Contracting LLC. They were awesome to work with, they were professional, responsive, and clearly knew what they were doing. We had a massive leak that needed immediate attention, and they showed up quickly and handled it efficiently. They not only fixed the issue fast but also made sure everything was done right. I would absolutely recommend them to anyone needing reliable, high quality work!

    Jada WoolleyGoogle Review
  • Used 4L Contracting the first time a couple years ago and since then they have replaced a water heater, reset toilets, replaced water lines, and located and fixed a leak under the house! They have been amazing to work with over the years, I cannot recommend these guys enough!

    Mary JohnsonGoogle Review
  • Water Softener installation Completed! Just wanted to give a shout out to Kurt and Lane on their outstanding customer service today. I hired 4L Contracting LLC to install a water softener in our home. After finding out the water softener I had purchased was missing parts, the job was rescheduled for Monday. I was able to return the water softener and get a replacement fairly quick. So I sent a text to Kurt, letting him know I had done so. He informed me they were nearby and could do the job in about 30 minutes if I could meet them back at my home. I hurried home and in about 2 hours the job was completed. Tonight my wife and I shall enjoy a soft water shower!

    Sam StathakosGoogle Review
  • My husband and I had a broken pipe in the foundation and it was leaking pretty bad into our hallway, and 4L Contracting came that day we called, assessed the issue, and was back the next day and completely fixed the problem. They were so nice and helpful! I cannot tell you how pleased we were with their service. I recommend 4L Contracting!

    Kim PagachGoogle Review
  • My wife and I discovered a water leak coming out of our wall. 4L Contracting LLC came out that day and found where the leak was coming from (copper pipe leaking in the slab), they started working immediately and finished the next day.

    Stephen PagachGoogle Review
  • These plumbers are honest, knowledgeable and reliable! They helped us fix a leak and answered all our questions about other issues in the house. Highly recommend!

    Kaitlin WeathersGoogle Review
  • Lee and his guys are Great. Their communication on our projects have been superb! Always letting us know when they will be at the job site. Lee is doing 3 projects for our Airbnb's at one time, and his organization of his paperwork is paramount for us.

    Michael WimberlyGoogle Review

Read all reviews on Google

WHAT IT COSTS AND HOW YOU PAY

Remodel plumbing is priced after we know what we are doing, not before. That means a site visit, a conversation about what you are building, and a written scope before any number goes on paper. We do not quote remodel work over the phone. The wall has not been opened yet. We have not seen the existing drain configuration or the available venting paths.

Written scope first

Before work starts you get a written description of what we will do, what materials we will use, and the price for that scope. Nothing proceeds without your signature.

Changes in writing

If the scope changes after the wall opens, we stop and write a change order before adding the work. You approve the price before we proceed. There are no surprise additions on the final invoice.

What affects the price

Access difficulty, fixture relocation distance, whether new venting is required, and permit fees all affect the final number. Straightforward fixture swaps in place cost less than moving a toilet across a slab.

Warranty on our work

All remodel plumbing we complete carries a workmanship warranty. If something we installed or connected develops a fault within that period, we come back and fix it at no charge. Material manufacturer warranties apply separately.

Financing: We work with homeowners who need to spread the cost of a larger remodel over time. Ask about financing options when you call. Office hours Monday to Friday, 7 AM to 5 PM. Licensed plumbers on call 24/7 for plumbing emergencies.

Drain Lines, Venting and the Slope a Drawing Does Not Show

This is the part of a remodel that is invisible on a plan and decides whether it works. Every fixture needs a vent as well as a drain. A drain without proper venting will gurgle, drain slowly and pull the water out of traps, letting sewer gas into the living space. A design that looks fine in a rendering can be unbuildable once venting is accounted for. That is particularly true in a room with limited wall height or a flat ceiling above.

Concrete slab construction, which is common in this area, limits what can be moved without cutting the floor. Cutting a slab is a real cost and a real decision, not a detail to be decided on the day demolition starts. The trench has to be dug, the concrete broken out, the pipes reset and the floor restored. All of that affects the project budget and timeline in ways a layout drawing does not show.

We work out the drain and vent route before the room is committed to a layout. That conversation is the single most useful hour on a remodel, and it costs nothing to have it before cabinets are ordered.

A plumber breaking out concrete to reroute a bathroom drain during a remodel

Kitchen Remodels, Islands and Where Water and Waste Have to Run

Kitchens concentrate several services in a small area, and a kitchen remodel typically involves several connections. The sink and its drain, the disposal connection, and the dishwasher supply and drain. The refrigerator water supply, and a gas connection where a range is changing fuel. Each of those has its own rough in requirement, and the trades have to work in an order that accounts for all of them.

An island is the classic problem. A sink or a cooktop placed in the middle of a room has no exterior wall to run a vent up through. So venting an island sink is a design constraint rather than a preference. It has to be solved before the island position is finalized. Moving a kitchen sink from one wall to another is a drain question first and a countertop question second.

We would rather see the kitchen layout before it is ordered than after. A conversation at the planning stage costs nothing. A conversation after the cabinets are delivered can cost a great deal more.

Bathroom Remodels, Tub to Shower Conversions and Curbless Floors

Bathroom remodels cover a range of work. A new shower valve and its rough in location. A tub coming out and a shower going in, over the same footprint or a larger one. A shower drain that has to be moved or lowered. A relocated vanity with a new drain and shut off valves. A toilet whose flange has to shift to match the new layout. Each of those is a separate rough in task, and they all have to be complete before the surfaces go in.

Tub to shower conversions and low or curbless shower floors are the two requests that most often need the floor structure looked at. A curbless drain has to sit lower than a straight swap allows. Whether that is achievable depends on what is under the floor and how much depth is available. That is the question to answer at the planning stage, not on demolition day.

Waterproofing, tiling and the shower pan build up are usually a separate trade. We say clearly where our work ends and theirs begins so nobody assumes the other has covered something they have not.

What We Find Once the Wall Is Open

Remodels expose the past. Once the wall comes down, several things can turn up. Old pipe in poor condition. A previous alteration that was never done properly. A drain that has been running on the wrong fall for years. Corroded connections. A leak that has been quietly wetting a cavity without ever showing up at a surface. This is normal in an older building and not a sign that something has gone wrong with the project.

Anything found is put to the owner or the contractor as a decision. The reasons and the consequences of leaving it go in writing, before it becomes authorized work. The best time to correct something behind a wall is while the wall is open. We will say so once, and then respect the answer.

Not sure where to start?

Talk to a licensed plumber

Describe what your plumbing is doing and we will tell you what it likely is before anyone comes out.

Working with a General Contractor or with an Owner Running the Job

We work both ways. As the plumbing trade under a general contractor who is coordinating all the trades. And directly for an owner who is managing their own remodel. The plumbing work itself is the same either way. What changes is who calls the sequence. Who is on site to make a decision when one is needed. And who holds the schedule when another trade runs late.

An owner running their own job takes on the coordination as well as the savings. We tell them clearly what we need from them and when. We do not assume they already know the sequence. A building going up from nothing is a different job with a different sequence altogether. That work sits on the commercial new construction plumbing page.

Sequencing, Inspections and the Point Where Work Has to Be Left Open

Plumbing on a remodel is not one visit. The order runs like this: demolition, then rough in, then inspection where the work requires it. Then the walls and floors get closed, then the finishes, then finish out. Each stage depends on the one before it. The trades that follow plumbing cannot start until plumbing is done and, where required, inspected.

Inspection has to happen while the pipework is still visible. The work cannot be covered up on a whim, and a trade cannot be brought forward without consequence. Permit and inspection requirements depend on the work and the jurisdiction, and we address the applicable requirements for the approved scope of each project. This page is not code advice, and requirements vary.

The trade most likely to be blamed for a delay is whichever one was scheduled last. We would rather agree the order at the start of a project than argue about it in week five. So we tell owners and contractors what sequence the job needs before work begins.

Finish Out, Setting the Fixtures and the Walk Through at the End

Finish out is fitting and connecting the fixtures once the surfaces are finished. Then everything is tested under normal use. Every connection is checked for leaks before the room is handed back. It is the second plumbing visit on a remodel, and it cannot happen until the tile, drywall and paint are complete.

Fixtures should be on site before finish out is scheduled. A missing part turns one visit into two, with a second mobilization cost attached. A fixture the owner supplies is checked for what it needs, including valve type and supply connections. That check happens before the walls close, not on the day it is fitted.

We go through the finished work with the owner or the contractor and show them the shut offs for everything that is new. Those fixtures will eventually need servicing. The toilet repair and faucet and fixture repair pages cover what that work looks like long after the remodel is finished.

Remodel questions we are asked before demolition starts

Answers to what homeowners and contractors ask us most often before a kitchen or bathroom project gets underway.

REMODEL PLUMBING NEAR YOU

We work across College Station, Bryan and the towns around them. Pick your town, or check whether we cover your area.

BryanCollege StationSurrounding areas

Talk to a plumber before the remodel starts

The plumbing decisions that are hardest to fix are the ones made after the walls closed and the tile went down. A conversation before demolition costs nothing and can change what you plan significantly.

We serve College Station, Bryan, and the surrounding Brazos Valley. Office hours Monday to Friday, 7 AM to 5 PM. Licensed plumbers on call 24/7 for plumbing emergencies.

Call 979-473-9775Get a starting price

Price in writing before work starts. Workmanship warranty on all remodel plumbing.

Have a plumbing question? Contact an expert.